Cashmere Valley Dam, Christchurch

CLIENT: GSL LTD

Supplied and installed concrete structures to inlet and outlet to dam at Cashmere Valley to form new flood attenuation area. 1800mm NB concrete culvert pipe installed. New timber boardwalks, steps and handrails, gratings, and steel fabricated walkways across wetland areas.

Te Kaha Multi Arena, Christchurch

CLIENT: BESIX WATPAC

Supplied and install in-situ concrete walls for stage 1 at Christchurch’s new multi-use arena for the West and Northwest stands. These stands will contain the changing sheds, press rooms, gym, tunnel connections from dressing room to pitch and other key spaces. We feel proud to be contributing to such a landmark project for the city and look forward to seeing this key anchor project due to be competed in 2026.

Metro Sports Facility, Christchurch

CLIENT: CPB CONSTRUCTION

When construction is complete the Metro Sports Facility will be the largest aquatic and indoor recreation and leisure facility in New Zealand. Providing day to day leisure, and recreational education and hi performing sporting in Christchurch. Kstruct is honoured to be working under CPB to install the reinforced concrete Fire Egress Ramp to the main facility, which started May 2022. With a result of our workmanship and expertise, we have been awarded ongoing additional work packages for concrete service yards and foundation repairs.